Project Name Client Project Highlights Finish Date
Scarab / SaffronMediterranean - Offshore Egypt Burullus Gas (BG, Edison, EGPC) Deepwater 90 km subsea gas tie-backFull systems/Flow Assurance and Operability work scope for FEED and detailed engineering. Steady state and transient thermal-hydraulic simulations to determine line sizes, hydrate control, slugging assessment, metering, and subsea operating philosophy. Chemical injection system design including subsea glycol distribution. Ongoing
King KongGulf of Mexico Mariner 15 deepwater subsea gas development, tie-back to the Allegheny Platform. Flow assurance design and flowline sizing detailed modeling of the reservoir/well/ flowline/platform system. Ongoing
Aconcagua / Canyon ExpressGulf of Mexico Elf Deepwater 43 mile subsea gas tie-backFull Flow Assurance work scope for FEED. Production system hydraulics, steady state and transient. Subsea multiphase flow metering considerations. Chemical injection system design. Operating philosophy. Ongoing
AgbamiOffshore Nigeria Texaco Deepwater, subsea oil developmentFull Flow Assurance work scope for FEED. Steady state and transient thermal-hydraulic simulations to determine line sizes, insulation requirements, hydrate and wax control, slugging assessment, and subsea operating philosophy. Ongoing
Angola LNGOffshore Angola Texaco Long-distance gas gathering systemSteady state and transient hydraulic analyses in support of conceptual design. Ongoing
Benequela Belize Tomboco Chevron Deepwater subsea oil tie-back and export pipelines. FEED level flow assurance design. Line sizing, insulation requirements, and transient analysis of slugging, shutdown, and start-up. Ongoing
Flow Assurance Design Guide DeepStar Development of Flow Assurance design guide for DeepStar member companies. Ongoing
Ringhorne North Sea Esso Norge Tie-back of wellhead platform to FPSO Pigging Assessment. Evaluate need to pig liquids in rich gas flowline via transient analysis. Ongoing
Boomvang / NansenGulf of Mexico Kerr-McGee Deepwater, subsea oil and gas-condensate developmentConceptual and FEED level Flow Assurance assessment. Line sizing, insulation, and chemical injection requirements. 2001
Flow Assurance Technical Advisory DeepStar Technical support provided to DeepStar Flow Assurance Committee. 2001
Horn Mountain BP/Vastar Deepwater gas and oil export Flowlines. Steady state and transient flow assurance studies, from line sizing to operating strategies. 2000
Black WidowGulf of Mexico Mariner One well tieback to Morpeth Conceptual level Flow Assurance and Operability design. 2000
Crazy HorseGulf of Mexico BP Deepwater oil development Support for screening study. 2000
Devil's TowerGulf of Mexico Mariner Development Study Conceptual level Flow Assurance and Operability design. 2000
El ToroGulf of Mexico Shell Subsea tie-in of oil wells into existing subsea system. Conceptual level Flow Assurance. Steady state and transient thermal-hydraulic analyses of subsea system design options. Operating strategies. 2000
IntruderGulf of Mexico Ocean Energy Deepwater oil developmentConceptual level engineering. 2000
PanyuOffshore China Sante Fe Heavy oil development in shallow water Conceptual level Flow Assurance assessment. Line sizing, insulation, pumping requirements and operating strategies. 2000
MianoPakistan Alliance Engineering Gas-condensate pipeline feeding a gas plant in hilly terrain. Detailed steady and transient hydraulic analysis to determine pressure loss, liquid holdup, terrain slugging, and ramp-up liquid surge. Assessed size and controls for slug catcher. 2000
ApiaGulf of Mexico Mariner Subsea tie-back Conceptual level Flow Assurance and Operability design. 1999
Belema Shell & ABB Multiphase gas gathering system. Transient simulations were developed to assess slugging and to determine liquid handling requirements. 1999
BluestreamBlack Sea Petergaz 390 km gas transmission pipeline in water depths to 2,100 m. Assessment of hydrate potential. Development of operating strategy. 1999
BongaOffshore Nigeria Shell Deepwater Development Systems 90 km, deepwater, multiphase gas export pipeline. Steady-state hydraulic simulations were performed to evaluate line diameter and liquid holdup. Transient simulations were performed to scope the need for HIPPS. 1999
DulcimerGulf of Mexico Mariner 12.5 mile one-well tieback Conceptual through detailed engineering. Overall Flow Assurance and Operability design. 1999
FujiGulf of Mexico Texaco Deepwater, subsea oil development. Three design iterations since 1995. Conceptual engineering. Development of Flow Assurance design and operating philosophies, thermal management study. 1999
GeminiGulf of Mexico Chevron Deepwater, subsea gas tieback.Operability review. 1999
Hungo-DikanzaAngola Block 15 Exxon Upstream Development Company Subsea and surface production to floating facilities. Conceptual engineering. Steady-state simulations to determine subsea flowline diameters. Transient thermal simulations to determine insulation requirements. 1999
KingGulf of Mexico Amoco Deepwater, subsea oil developmentFinite element modeling and actual scale testing of VIT and PIP thermal performance. 1999
KuitoPhase 1CAngola Block 14 Chevron Deepwater subsea oil development Conceptual Flow Assurance analyses. Hydraulic analysis and line sizing, assessment of deposition potential, development of operating strategies. 1999
MalampayaOffshore Phillipines Cameron / Shell 30 km deepwater, subsea gas tie-back to shallow water platform Operating philosophy and outline procedures for preliminary engineering. 1999
MatterhornGulf of Mexico Elf Oil and gas long-distance tiebacks Conceptual-level Flow Assurance design and flowline sizing. 1999
MicaGulf of Mexico Exxon Upstream Development Company Oil and gas long-distance tiebacks Conceptual engineering. Pigging and system and Thermal performance evaluation. 1999
Mustique Gulf of Mexico Mariner Subsea tie-back of gas-condensate field benchmarking. Comparison of predicted to observed pressure drops. 1999
Name withheldGulf of Mexico Marathon Long distance, deepwater subsea tieback of gas-condensate field conceptual engineering. Steady-state hydraulic simulations were performed to determine line diameters. Hydrate inhibition requirements were calculated. Heat loss was calculated to determine wax deposition. The production system re-start was dynamically simulated to determine liquid surge. 1999
Name withheldGulf of Mexico Shell Offshore, Inc. 12 mile subsea tie-back of gas-condensate field steady-state hydraulic simulations performed to evaluate system capacities. Transient simulation of shutdown operations used to assess the need for over-pressure protection. 1999
Name withheldGulf of Mexico Unocal 2 well long-distance tieback re-evaluation of Flow Assurance issues. 1999
OGGSOffshore Nigeria Shell Gathering systems for gas previously flared. Conceptual engineering. Line sizing and pressure ratings; platform compression considerations. 1999
PlutoGulf of Mexico Mariner 18 mile subsea tie-back of difficult gas-condensate field. Conceptual through detailed engineering. Extensive steady-state thermal-hydraulic and hydrate analyses were performed. Transient simulations of well clean-up. 1999
PrinceGulf of Mexico El Paso Conceptual level Flow Assurance. 1999
SweetheartGulf of Mexico Mariner Development Study Conceptual level Flow Assurance and Operability design. 1999
West Delta Deep MarineMediterranean - Offshore Egypt British Gas 48 mile subsea tie-back of gas-condensate field conceptual engineering. Steady-state hydraulic and transient simulations to evaluate liquid holdup and to model. Startup and the resulting liquid surge and of line-packing during shutdown. 1999