The following table contains a summary of INTEC experience in various Pipeline and Riser Projects.
| Project Name |
Client |
Project Highlights |
Finish Date |
| Eastchester Pipeline Extension Project New York, USA |
Iroquois Gas Transmission Company
|
24-inch x 27 miles long offshore pipeline crossing the Long Island Sound to the Bronx area. |
Ongoing |
| Mardi Gras Deepwater Pipeline System Gulf of Mexico |
BP
|
Large diameter Oil and Gas export pipelines in water depth to 6,200 ft in the Gulf of Mexico. |
Ongoing |
| Agbami Field Development Offshore Nigeria |
ChevronTexaco
|
Front End Engineering Design of the development of EPIC bid packages for an FPSO and subsea systems, including flowlines, risers and export system for a major field development in 5,400 ft water depth. |
Ongoing |
| Scarab/Saffron Field Development Offshore Egypt |
Burullus Gas Company
|
Deepwater Managing Contractor (DMC) for an 8-well subsea field development in 2,800 ft water depth with dual 40 mile long 24- and 36-inch pipelines to an onshore gas processing plant. |
2003 |
| Canyon Express Gulf of Mexico |
TotalFinaElf
|
12-inch x 96 miles Gas production pipeline in maximum water depth of 7,250 ft, transversing through challenge terrain. |
2002 |
| Horn Mountain Export Pipelines Gulf of Mexico |
BP (Vastar)
|
12-inch Oil 36-inch and 10-inch Gas pipelines, 42 miles long in maximum water depth of 5,420 ft. |
2002 |
| Mobil Bay Pipeline Projects, MB-63.2, MO-822.7, and MB-63.3Mobile, Alabama, USA |
ExxonMobil Production Company (New Orleans)
|
3-high temperature (300F) and high pressure (7,000 p.s.i.) flowline and pipe-in-pipe systems in the Mobil Bay area. |
2001 |
| Marshall-Madison Flowline Project Gulf of Mexico |
ExxonMobil Development Company
|
Three subsea wells and 6-inch by 10-inch pipe-in-pipe insulated production flowlines in water depths approximately 4,800 ft. |
2001 |
| Zafiro Project Offshore West Africa |
Mobil Equatorial Guinea
|
Multiple flowlines for a 10 well subsea field development. |
2000 |
| Diana Development Project Gulf of Mexico |
Exxon Mobil Development Company
|
Two 20-inch x 130 mile pipelines at 5,000 ft water depth in the Gulf of Mexico. |
2000 |
| Mica Field Development Project Gulf of Mexico |
ExxonMobil Development Company
|
8-inch and 12-inch pipe-in-pipe flowlines and an 8-inch x 28 mile long flowline in water depths of 1,300 to 4,500 ft. |
2000 |
| Shell Bonga Gas Export Pipeline Offshore Nigeria |
Shell Deepwater Development Systems Inc.
|
16-inch x 27 km gas export pipeline from the Bonga FPSO with SCR in 1,100 m water depth to a shallow water riser platform. |
1999 |
| Blue Stream Pipeline Project Black Sea |
GasProm / PeterGas B.V.
|
2 x 24-inch x 300 km gas pipelines crossing the Eastern Black Sea between Djubga, Russia and Samsun, Turkey in water depth of 2,100 m. Sea bed has high levels of H2S. |
1999 |
| BSP AMRJ-I and Tulong Pipeline Offshore Brunei |
Brunei Shell Petroleum Company
|
16-inch x 25 km long offshore pipeline from AMRJ-I Platform to shore, and a 14-inch x 14 km long pipeline with a subsea tap into a 16-inch pipeline. |
1999 |
| Esso Marine Terminal Pipeline System Sriracha, Thailand |
Esso Thailand
|
Four 12-inch and one 2-inch diameter pipelines and risers from an offshore tanker terminal to an onshore refinery. |
1999 |
| Pluto Subsea Development Project Gulf of Mexico |
Mariner Energy, Inc.
|
Detailed Design of 8-inch x 30 mile long flowline from subsea well in 2,700 ft water depth to a host platform. |
1999 |
| King/King's Peak Subsea Development Project Gulf of Mexico |
Amoco, Inc.
|
6-inch in 10-inch pipe-in-pipe flowlines, 6-inch and 8-inch flowlines and 16-inch export pipeline in 5,500 ft to 6,600 ft water depth including the first pipe-in-pipe SCR. |
1999 |
| Angola Block 15 Project Offshore West Africa |
Exxon Upstream Development Company
|
Multiple 6-inch to 10-inch flowlines in 1,200 m water depth including pipe-in-pipe and bundles. Flexible risers and hybrid riser towers for connection to an FPSO. |
1999 |
| Gemini MC 292 Subsea Field Development Gulf of Mexico |
Texaco, Inc.
|
Dual 12-inch x 28 mile long gas flowlines in 3,400 ft water depth. |
1999 |
| Fuji Subsea Development Project Gulf of Mexico |
Texaco, Inc.
|
8-inch and 14-inch x 32 mile long pipe-in-pipe flowline in 4,200 ft water depth. |
1999 |
| Neptune Subsea Development Project Gulf of Mexico |
British Petroleum Exploration Inc.
|
Two 26-inch export pipelines and SCR's in 6,000 ft water depth. |
1998 |
| Tapis-E Field Pipeline Detailed Engineering Design Offshore Malaysia |
Esso Production Malaysia Inc.
|
12-inch diameter 10 km long production pipeline 10-inch diameter x 6 km long water injection and 6-inch diameter x 6 km long gas life pipeline and risers between Tapis-E and Tapis-A and B Platforms. |
1998 |
| East Mississippi Canyon Project Gulf of Mexico |
Shell Oil Company
|
Three 18-inch to 24-inch OD x 150 mile pipelines in a water depth of 7,500 ft in the Gulf of Mexico. |
1998 |
| Gorgon Subsea Field Development Offshore Western Australia |
Texaco, Inc. and Mobil Oil Company
|
Multi-well subsea manifolds, in field flowlines and large diameter trunkline to Barrow Island. Water depths from 100 m to 1,100 m. |
1998 |
| Malampaya Pipeline Project Offshore Philippines |
Shell International Exploration and Production
|
2x16-inch CRA clad flowlines and a 24-inch 500 km long export pipeline across a 1,000 m water depth region susceptible to mass gravity flows and seismic action. |
1998 |
| Trans Caspian Pipeline Project Caspian Sea |
Enron USA
|
Dual 28-inch x 300 km long gas pipelines crossing the Caspian Sea through 200 m water depth from Turkmenistan to Turkey. |
1998 |
| Conoco West Natuna Gas Project Offshore Indonesia |
Conoco, Inc.
|
20-inch x 472 km gas trunkline with smaller lateral pipelines connecting several production platforms to the trunkline via subsea manifolds. Pipelines were based on limit state design approach. |
1998 |
| MLNG-Tiga Pipeline Project Offshore Malaysia |
Petronas Carigali Sdn Bhd
|
22-inch x 109 km long gas pipeline from Helang Field to E11R-C Riser platform. 36-inch x 150 km long gas pipeline from Jintan Field to E11R-C Riser platform. 32-inch x 132 km long pipeline from E11R-C Riser Platform to onshore LNG plant at Bintulu, Sarawak. |
1998 |
| Yadana Pipeline Project Offshore Myanmar |
TOTAL Moattama Gas Company
|
36-inch x 340 km long offshore gas export pipeline from offshore Myanmar to a landfall at Heinze Chaung in Thailand. |
1997 |
| Natuna Pipeline Project South China Sea |
Exxon Production Research
|
36-inch x 1,000 km long gas export pipeline from the Natuna Field offshore Indonesia to a junction platform offshore Thailand. |
1997 |
| Tantawan Field Development Gulf of Thailand |
Pogo Producing Inc.
|
Production flowlines between two platforms and an FPSO and a gas sales pipeline. |
1997 |
| Green Canyon 60 Development Project Gulf of Mexico |
Mobil Exploration & Producing US, Inc.
|
Two 6-inch x 8 mile long flowlines in water depth of 760 ft connected to a platform via steel catenary risers (SCRs). |
1996 |
| Allegheny Field Development Gulf of Mexico |
Enserch
|
4-inch and 6-inch pipe-in-pipe flowlines and 12-inch and 16-inch export pipelines including steel catenary risers in water depth, 3,000 ft. |
1996 |
| Chrysaor Field Pipeline System Offshore Western Australia |
Western Australia Petroleum (WAPET)
|
Corrosion Resistant Alloy (CRA) flowlines in water depth of 200 to 1,000 m and 75 km long trunkline to Barrow Island. |
1996 |
| Mobil Etim and Ubit Pipelines Offshore Nigeria |
Mobil Producing Nigeria Limited
|
Three 12-inch pipelines from Etim and Ubit Platforms to an existing production platform. |
1996 |
| Tapis A and B Field Pipeline Risers Offshore Malaysia |
Esso Production Malaysia Inc.
|
Riser stress analysis for 12-inch crude oil pipeline at Tapis-A Platform and 6-inch gas lift and 10-inch water injection pipeline risers at Tapis-B Platform. |
1996 |
| Seligi-F Field Development Offshore Malaysia |
Esso Production Malaysia Inc.
|
16-inch diameter 4 km long 3-Phase production pipeline, two (3-inch and 6-inch diameter 4 km long) gas life pipelines Seligi-F and Seligi-D Platforms. |
1995 |
| Oman-India Gas Pipeline Indian Ocean |
Oman Oil Company
|
24-inch x 1,100 km gas pipeline in water depths to 3,500 m between Oman and India. |
1995 |
| Marlim/ Albacora Field Pipelines Offshore Brazil |
Stena Construction
|
6-inch to 16-inch diameter pipeline in water depths to 900 m in the Marlim and Albacora Fields. |
1994 |
| Skaha Lake Pipeline Crossing Vancouver, BC, Canada |
BC Gas
|
A 16-inch gas pipeline crossing of an inland lake in British Columbia. High scrutiny of environmental aspects. |
1994 |
| Mississippi Canyon 401/ 445 Subsea Development Gulf of Mexico |
Oryx Energy
|
Three subsea gas wells in up to 600 m water depth individually tied back to a shallow water platform with flexible flowlines and control umbilical. |
1994 |
| Rocky Field Development Project Gulf of Mexico |
Shell Offshore
|
Two 3-inch in 6-inch pipe-in-pipe flowlines, 4 miles long in a water depth of 1,800 ft in the Gulf of Mexico. |
1994 |
| Mobile Bay Flowlines Gulf of Mexico |
Exxon USA
|
Flowline systems for high pressure, high temperature sour gas using special corrosion resistant alloy materials and pipe-in-pipe insulated flowlines and risers. |
1994 |
| Zinc Subsea Field Development Gulf of Mexico |
Exxon USA
|
Detailed design of three flowlines and control umbilical between a subsea production template in 450 m water depth and a shallow water platform. |
1993 |
| Lasmo Cohasset/ Panuke Field Pipeline System Nova Scotia, Canada |
Lasmo Nova Scotia Ltd
|
One 8-inch production flowline and one 6-inch water injection line, each 10 km long between Cohasset and Panuke Platforms, two 6-inch x 2.4 km long condensate export flowlines to an FSO. |
1992 |
| Vancouver Island Pipeline Project Offshore Western Canada |
Westcoast Energy, acting on behalf of Pacific Coast Energy Corporation
|
Second deepest pipeline when installed in 1991, ROV operated deepwater mechanical pipeline supports, deepwater survey techniques and vertically drilled shore crossing through rock. |
1992 |
| Fairway Field Flowlines Mobile Bay Offshore Alabama |
Shell Oil Company
|
Four 6-inch inconel lined flowlines for transport of high pressure, high temperature, sour gas from satellite wellhead platforms to central production platform. |
1991 |
| Northwest Palawan Gas Development Offshore Philippines |
Occidental Petroleum International
|
480 km long large diameter gas pipeline in water depths of 450 to 900 m. |
1990 |
| Merluza Gas Pipeline Project Offshore Brazil |
Shell Pecten Exploration
|
First long distance gas pipeline system consisting of 16-inch x 186 km offshore, with 25 km long onshore segment with horizontally drilled shore crossing. |
1990 |
| Project Name |
Client |
Project Highlights |
Finish Date |
| Eastchester Pipeline Expansion ProjectLong Island Sound, New York |
Iroquois / Stone and Webster
|
24-inch gas pipeline from Northport, Long Island to Eastchester, New York. Highly environmentally sensitive. |
2002 |
| Mobile Bay Flowlines Offshore Alabama |
Exxon USA
|
Flowline system for high pressure sour gas using special non-corrosive materials and insulated pipe. |
2001 |
| Northstar and Liberty Projects, Offshore Alaska |
British Petroleum Exploration (Alaska), Inc.
|
First arctic offshore pipeline projects in the USA. |
2001 |
| El Paso Prince Field Development Gulf of Mexico |
El Paso Energy Partners
|
Mini-TLP in 470 m water depth, SCR risers and two export pipelines. |
2001 |
| Parana River Pipeline Crossing Argentina |
Techint
|
24-inch x 28 km pipeline crossing of a major river and flood plain. |
2000 |
| Installation of Fairway Field Flowlines Mobile Bay, Alabama |
Shell Oil Company
|
Installation of four 6-inch diameter high temperature, high pressure pipelines in shallow water. |
2000 |
| SPM Marine Terminal Dominican Republic |
Coastal Corporation
|
8-inch LPG and 12-inch diesel pipeline from a Conventional Buoy Mooring (CBM). |
1999 |
| Blue Stream Project (Black Sea Crossing)Black Sea |
Gazprom/PeterGaz Russia/Holland
|
24-inch x 380 km pipeline in 2,140 m water depth from Russia to Turkey, across the Black Sea. High H2S environment, extreme seabed gradients and potential geohazards. |
1999 |
| King Development Project Gulf of Mexico |
Amoco
|
12-inch and 16-inch export system in 2,000 m water depth in the Gulf of Mexico. Project management and supervision of deep tow, detailed pipeline route survey including swathe bathymetry, sidescan survey and soil sampling. |
1999 |
| Pluto Development Project Gulf of Mexico |
Mariner Energy
|
Subsea tie-back development in 2,700 m water depth. Desktop study and total project management of deep tow swathe bathymetry pipeline route survey. |
1999 |
| Dulcimer Development Project Gulf of Mexico |
Mariner Energy
|
Subsea tie-back development in 1,120 m water depth. Desktop studies and total project management of deep tow swathe bathymetry pipeline route survey. |
1999 |
| Gyrfalcon Project Gulf of Mexico |
TOPS
|
Subsea tieback in 250 m water depth. |
1999 |
| Malampaya Development Project Philippines |
Shell Philippines Exploration (SPEX)
|
24-inch x 500 km pipeline to 900 m water depth. Significant geohazard issues, debris and turbidity flows, continental collision zone, seismically active, highly irregular seabed. |
1998 |
| SPM Marine Terminal Manavgat Water Supply Project Turkey |
D.S.I.
|
A water export project on the Mediterranean coast of Turkey involving two SPM systems and four 48-inch 3 km long loading lines for export of fresh water. |
1998 |
| PSR-2 Marine Terminal and Submarine Pipeline,Malaysia |
Malaysian Refining Co. Sdn Bhd
|
48-inch 10 km long crude oil offloading pipeline, SPM system and tie-in to onshore facilities. |
1998 |
| CABOT Terminal Project Port Dickson, Malaysia |
CABOT Malaysia Sdn. Bhd.
|
Marine terminal project including 9.3 km pipeline in 32 m water depth. |
1998 |
| High Island 587 Development Project Gulf of Mexico |
British Petroleum
|
9.7 km subsea tie-back in 120 to 300 m water depth. |
1996 |
| Oman to India Pipeline Arabian Sea |
Oman Oil Company
|
28-inch x 1,130 km pipeline in 3,500 m water depth.Significant geohazard issues in crossing of the Arabian Sea. Dual vessel towed detailed geophysical survey in 3,500 m water depth (world first). |
1995 |
| Star and Rayong SPM Marine Terminal Thailand |
Caltex
|
SPM and 19 km long 48-inch pipeline to serve Caltex and Shell refineries near Rayong, Thailand |
1995 |
| Caleta Cordova and Caleta Olivia Terminals Argentina |
TERMAP S.A
|
Two marine terminal projects including 7 km of pipeline and two CALM-type SPM systems. |
1995 |
| Pipeline Replacement Project Taiwan |
Chinese Petroleum Corporation
|
42-inch 5.2 km long crude oil pipeline, PLEM and underbuoy hose system. |
1995 |
| Vancouver Island Gas Pipeline Marine Crossings British Columbia, Canada |
Westcoast Energy, Inc.
|
Dual 10.75-inch x 46 km gas pipelines in 415 m water depth. World's second deepest pipeline at time of construction. |
1992 |
| Talinpu SPM No. 3 and No. 4 Marine Terminal Projects Taiwan |
Chinese Petroleum Corporation
|
SPM, 56-inch and 16-inch pipelines, 8 km in length. SPM, two 34-inch pipelines, 6 km in length. |
1991 |